Project portfolio selection with scheduling: an evolutionary approach
This paper addresses the project portfolio selection problem enriched with scheduling. Thefactors considered for project scheduling are: the planning time horizon and the negative impact of theproject completion time on the total profit. The objective is to select a subset of projects which maximize...
Na minha lista:
Autor principal: | Martínez-Vega, Daniel |
---|---|
Outros Autores: | Cruz-Reyes, Laura, Rangel V., Nelson, Gómez S., Claudia G., Sánchez Solís, Julia Patricia, Pérez V., Mercedes |
Formato: | Artículo |
Idioma: | English |
Publicado em: |
2019
|
Assuntos: | |
Acesso em linha: | https://www.ijcopi.org/index.php/ojs/article/view/113 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
Registos relacionados
-
Interdependent Projects Selection with Preference Incorporation
Por: Gómez, Claudia
Publicado em: (2018) -
Genetic Algorithm for Scheduling Optimization Considering Heterogeneous Containers: A Real-World Case Study
Por: Rivera Zarate, Gilberto
Publicado em: (2020) -
Metaheuristic-based optimization of treated water distribution in a Mexican City
Por: Alvarado, Osvaldo
Publicado em: (2018) -
Improvement project in higher education institutions: A BPEP-based model
Publicado em: (2020) -
Exact analytic solution of an unsolvable class of first Lane–Emden equation for polytropic gas sphere
Por: torres cordoba, rafael
Publicado em: (2020)