Project portfolio selection with scheduling: an evolutionary approach
This paper addresses the project portfolio selection problem enriched with scheduling. Thefactors considered for project scheduling are: the planning time horizon and the negative impact of theproject completion time on the total profit. The objective is to select a subset of projects which maximize...
Bewaard in:
Hoofdauteur: | Martínez-Vega, Daniel |
---|---|
Andere auteurs: | Cruz-Reyes, Laura, Rangel V., Nelson, Gómez S., Claudia G., Sánchez Solís, Julia Patricia, Pérez V., Mercedes |
Formaat: | Artículo |
Taal: | English |
Gepubliceerd in: |
2019
|
Onderwerpen: | |
Online toegang: | https://www.ijcopi.org/index.php/ojs/article/view/113 |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Gelijkaardige items
-
Interdependent Projects Selection with Preference Incorporation
door: Gómez, Claudia
Gepubliceerd in: (2018) -
Genetic Algorithm for Scheduling Optimization Considering Heterogeneous Containers: A Real-World Case Study
door: Rivera Zarate, Gilberto
Gepubliceerd in: (2020) -
Metaheuristic-based optimization of treated water distribution in a Mexican City
door: Alvarado, Osvaldo
Gepubliceerd in: (2018) -
Improvement project in higher education institutions: A BPEP-based model
Gepubliceerd in: (2020) -
Exact analytic solution of an unsolvable class of first Lane–Emden equation for polytropic gas sphere
door: torres cordoba, rafael
Gepubliceerd in: (2020)