Project portfolio selection with scheduling: an evolutionary approach
This paper addresses the project portfolio selection problem enriched with scheduling. Thefactors considered for project scheduling are: the planning time horizon and the negative impact of theproject completion time on the total profit. The objective is to select a subset of projects which maximize...
Uloženo v:
Hlavní autor: | Martínez-Vega, Daniel |
---|---|
Další autoři: | Cruz-Reyes, Laura, Rangel V., Nelson, Gómez S., Claudia G., Sánchez Solís, Julia Patricia, Pérez V., Mercedes |
Médium: | Artículo |
Jazyk: | English |
Vydáno: |
2019
|
Témata: | |
On-line přístup: | https://www.ijcopi.org/index.php/ojs/article/view/113 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Podobné jednotky
-
Interdependent Projects Selection with Preference Incorporation
Autor: Gómez, Claudia
Vydáno: (2018) -
Genetic Algorithm for Scheduling Optimization Considering Heterogeneous Containers: A Real-World Case Study
Autor: Rivera Zarate, Gilberto
Vydáno: (2020) -
Metaheuristic-based optimization of treated water distribution in a Mexican City
Autor: Alvarado, Osvaldo
Vydáno: (2018) -
Improvement project in higher education institutions: A BPEP-based model
Vydáno: (2020) -
Exact analytic solution of an unsolvable class of first Lane–Emden equation for polytropic gas sphere
Autor: torres cordoba, rafael
Vydáno: (2020)