Modeling and project portfolio selection problem enriched with dynamic allocation of resources
The problems of the real world, within which the variable time is present, have involved continuous changes. These problems usually change over time in their objectives, constraints or parameters. Therefore, it is necessary to carry out a readjustment when calculating their solution. This paper prop...
Zapisane w:
1. autor: | Martínez Vega, Daniel |
---|---|
Kolejni autorzy: | Rivera-Zárate, Gilberto |
Format: | Capítulo de libro |
Język: | English |
Wydane: |
Springer
2018
|
Hasła przedmiotowe: | |
Dostęp online: | https://doi.org/10.1007/978-3-319-71008-2_26 https://link.springer.com/chapter/10.1007/978-3-319-71008-2_26 |
Etykiety: |
Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
|
Podobne zapisy
-
Robustness analysis of an outranking model parameters’ elicitation method in the presence of noisy examples
od: Rangel Valdes, Nelson
Wydane: (2018) -
Information asymmetry, an obstacle to government support in the time of COVID-19 in Mexico
od: Luis Antonio Andrade Rosas
Wydane: (2022) -
Project portfolio selection with scheduling: an evolutionary approach
od: Martínez-Vega, Daniel
Wydane: (2019) -
Using Compensatory Fuzzy Logic to Model an Investor’s Preference Regarding Portfolio Stock Selection within Markowitz’s Mean-Variance Framework
od: Rivera Zarate, Gilberto
Wydane: (2024) -
Interdependent Projects Selection with Preference Incorporation
od: Gómez, Claudia
Wydane: (2018)