Modeling and project portfolio selection problem enriched with dynamic allocation of resources
The problems of the real world, within which the variable time is present, have involved continuous changes. These problems usually change over time in their objectives, constraints or parameters. Therefore, it is necessary to carry out a readjustment when calculating their solution. This paper prop...
Salvato in:
Autore principale: | Martínez Vega, Daniel |
---|---|
Altri autori: | Rivera-Zárate, Gilberto |
Natura: | Capítulo de libro |
Lingua: | English |
Pubblicazione: |
Springer
2018
|
Soggetti: | |
Accesso online: | https://doi.org/10.1007/978-3-319-71008-2_26 https://link.springer.com/chapter/10.1007/978-3-319-71008-2_26 |
Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne! !
|
Documenti analoghi
-
Robustness analysis of an outranking model parameters’ elicitation method in the presence of noisy examples
di: Rangel Valdes, Nelson
Pubblicazione: (2018) -
Project portfolio selection with scheduling: an evolutionary approach
di: Martínez-Vega, Daniel
Pubblicazione: (2019) -
Information asymmetry, an obstacle to government support in the time of COVID-19 in Mexico
di: Luis Antonio Andrade Rosas
Pubblicazione: (2022) -
Interdependent Projects Selection with Preference Incorporation
di: Gómez, Claudia
Pubblicazione: (2018) -
Genetic Algorithm for Scheduling Optimization Considering Heterogeneous Containers: A Real-World Case Study
di: Rivera Zarate, Gilberto
Pubblicazione: (2020)