Modeling and project portfolio selection problem enriched with dynamic allocation of resources
The problems of the real world, within which the variable time is present, have involved continuous changes. These problems usually change over time in their objectives, constraints or parameters. Therefore, it is necessary to carry out a readjustment when calculating their solution. This paper prop...
Wedi'i Gadw mewn:
Prif Awdur: | Martínez Vega, Daniel |
---|---|
Awduron Eraill: | Rivera-Zárate, Gilberto |
Fformat: | Capítulo de libro |
Iaith: | English |
Cyhoeddwyd: |
Springer
2018
|
Pynciau: | |
Mynediad Ar-lein: | https://doi.org/10.1007/978-3-319-71008-2_26 https://link.springer.com/chapter/10.1007/978-3-319-71008-2_26 |
Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|
Eitemau Tebyg
-
Robustness analysis of an outranking model parameters’ elicitation method in the presence of noisy examples
gan: Rangel Valdes, Nelson
Cyhoeddwyd: (2018) -
Information asymmetry, an obstacle to government support in the time of COVID-19 in Mexico
gan: Luis Antonio Andrade Rosas
Cyhoeddwyd: (2022) -
Project portfolio selection with scheduling: an evolutionary approach
gan: Martínez-Vega, Daniel
Cyhoeddwyd: (2019) -
Using Compensatory Fuzzy Logic to Model an Investor’s Preference Regarding Portfolio Stock Selection within Markowitz’s Mean-Variance Framework
gan: Rivera Zarate, Gilberto
Cyhoeddwyd: (2024) -
Interdependent Projects Selection with Preference Incorporation
gan: Gómez, Claudia
Cyhoeddwyd: (2018)