Interdependent Projects Selection with Preference Incorporation
The Project Portfolio Problem (PPP) has been solved through different approaches. The success of some of them is related to a proper application of the decision-maker’s preferences, and a correct identification of organization’s resource practices and conditions. However, there are still a small num...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | Capítulo de libro |
語言: | en_US |
出版: |
Springer
2018
|
主題: | |
在線閱讀: | https://doi.org/10.1007/978-3-319-56871-3_13 https://link.springer.com/chapter/10.1007/978-3-319-56871-3_13 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
總結: | The Project Portfolio Problem (PPP) has been solved through different approaches. The success of some of them is related to a proper application of the decision-maker’s preferences, and a correct identification of organization’s resource practices and conditions. However, there are still a small number of classes of PPP that have been solved using these approaches, and there is also a need for increasing them. Due to this situation, the present research develops a strategy, based on ant colony optimization that incorporates the decision-maker’s preferences into the solution of a case of PPP under conditions of synergy, cannibalization, redundancy, and with interactions between projects. The algorithm was experimentally tested, and the results show a good performance of it over a random set of instances. |
---|